How Do I...

           

News

Pine Flat Dam spillway expected to release water within days
6/29/2023
The U.S. Army Corps of Engineers expects to use the gated service spillway at Pine Flat Dam within the next seven days as temperatures rise along the Sierra Nevada, increasing snowmelt runoff that...
USACE to pause Isabella Dam water releases for routine inspection
6/26/2023
The U.S. Army Corps of Engineers Sacramento District will pause water releases from Isabella Dam’s outlet works on June 27 to conduct a routine inspection of the conduit at the base of the dam...
USACE waives day use fees at recreation areas on June 16 and June 19
6/15/2023 UPDATED
The U.S. Army Corps of Engineers is waiving day use fees at more than 2,850 USACE-operated recreation areas nationwide, including at Sacramento District’s 10 lake and river projects, in observance of...
Public meetings scheduled for Lower San Joaquin River Project
5/31/2023 UPDATED
The U.S. Army Corps of Engineers Sacramento District and the San Joaquin Area Flood Control Agency have released a draft Supplemental Environmental Assessment (SEA) and a draft Supplemental...
USACE opens larger, safer parking lot at Martis Valley Trail
5/19/2023
In coordination with Placer County and the Northstar Community Services District, the U.S. Army Corps of Engineers opened a new parking lot at Martis Creek Dam and Lake on May 19.Located directly...