Hot Info
...more
less

Social Media

  • FacebookFacebook
  • TwitterTwitter

 

 

Latest News

Temporary Closure: Along Almonaster Ave.

Work related to the Southeast Louisiana Urban Flood Control Project (SELA).
Published: 5/30/2023

Contract awarded for levee work for the West Shore Lake Pontchartrain project

The U.S. Army Corps of Engineers, New Orleans District, recently awarded a contract for constructing the third levee reach on the West Shore Lake Pontchartrain (WSLP) Hurricane and Storm Damage Risk Reduction project. This contract will construct approximately 1.8 miles of the 17.5-mile-long levee system that will provide 100-year level risk reduction to the area primarily in St. John the Baptist, St. James and St. Charles Parish.
Published: 4/28/2023

USACE to install supplemental pumps at the London Ave. PCCP

New Orleans – The U.S. Army Corps of Engineers, New Orleans District, in partnership with the U.S. Navy Supervisor of Salvage and Diving, will install temporary pumps at the London Avenue Permanent Canal Closure and Pumps (PCCP) as a precautionary measure for delivering sufficient pumping capacity during a tropical weather event. Site preparation and installation of crane mats could begin as early as Wednesday, April 26, 2023.
Published: 4/27/2023

Corps releases annual notice to all residents within Mississippi River Floodways

The U.S. Army Corps of Engineers, New Orleans District disseminated its annual notice to residents within Mississippi River floodways. The notice serves as a reminder to those that live, operate and/or do business within these floodways that there is a risk that they may experience flooding if the floodways are activated.
Published: 3/20/2023

Contract awarded for levee work for the West Shore Lake Pontchartrain project

The U.S. Army Corps of Engineers, New Orleans District, recently awarded a contract for constructing the second levee reach on the West Shore Lake Pontchartrain (WSLP) Hurricane and Storm Damage Risk Reduction project. This contract will construct approximately 1.7 miles of the 17.5-mile-long levee system that will provide 100-year level risk reduction to the area extending from the Bonnet Carre’ spillway to Garyville.
Published: 3/16/2023
Crews inspecting concrete canals along Gen. de Gaulle in Algiers as part of the SELA 72 Construction project
The West Shore Lake Pontchartrain project is located in southeast Louisiana on the east-bank of the Mississippi River in St. Charles, St. John the Baptist, and St. James parishes in southeast Louisiana. The West Shore Lake Pontchartrain Chief’s report was signed in June 2015 and the project was fully funded for design and construction in the Bipartisan Budget Act of 2018. 100-year storm surge risk reduction will be achieved by a variety of structural and non-structural features including construction of over 18 miles of levees and floodwalls and two new 2,000 cfs pump stations. While these features will reduce risk from storm surge associated with tropical events, they do not specifically reduce risk of flooding from significant rainfall.
On December 9, 2022, the Army Corps of Engineers, New Orleans District, broke ground on the Humble Canal Floodgate Preload project in Montegut, Louisiana, part of the Morganza to the Gulf flood risk reduction system

Public Outreach and Events

Today 
RadDatePicker
Open the calendar popup.
MayJune 2023July
SunMonTueWedThuFriSat
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8