Bathtub Installers in Flushing, NY (New York)
Prescreened Bathtub Installers in Flushing, NY
Var-Gas Multi Services, Inc.
(646) 588-0610
8125 Dongan Avenue
Elmhurst, NY 11373
Serving Flushing, NY
8125 Dongan Avenue
Elmhurst, NY 11373
Serving Flushing, NY
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Reviews of Flushing Bathtub Installers
Project: Install or Replace a Bathtub
New York, NY
New York, NY
I was satisfied with the tub being installed but he never brought to my attention the door knob he broke off of the bathroom door as well as one of the glass shelves near the tub. Also when he was done installing the tub and I went in to take a second look I realized we had only a shower head and no faucet for the tub. I called him and mentioned this and he said it was not part of my request that is why he did not mention it. That's what i get for assuming.....
Project: Install or Replace a Bathtub
Bayside, NY
Bayside, NY
Nick is very reliable and knowledgeable about his craft. Not only would I hire him again in a heartbeat but I would recommend him to anyone looking for an honest plumber.
Related Projects in Flushing, New York
More Flushing PlumbersMore New York Plumbers
More New York Bathtub Installers
Unscreened Plumbers in Flushing, New York
Things to Consider Before You Install or Replace a Bathtub in Flushing, New York:
- What type of bathtub do you want installed?
- Bathtub
- Plumbing fixtures (faucets, drains, etc)
- Tile
- Is this project part of a larger remodel?
Recent Job Requests for Install or Replace a Bathtub Contractors in Flushing, New York:
Project Location:
Flushing,
NY
11367
Date: 08/2015
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Historical Work: No
Property Owner: Yes
Comment: Remodeling a bathroom by gutting the current one and replacing everything.
Project Location:
Flushing,
NY
11358
Date: 06/2015
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Covered by Insurance: No
Comment: move existing tub to make room for shower
Project Location:
Flushing,
NY
11355
Date: 04/2015
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Historical Work: No
Property Owner: Yes
Comment: remove steel tub and install new cast iron tub
Project Location:
Flushing,
NY
11354
Date: 03/2015
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Project Location:
Flushing,
NY
11354
Date: 02/2015
Type of tub install: Soaking
Bathtub: Install a new bathtub (No existing bathtub)
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
Comment: This mobile user did not provide any additional comments.
Project Location:
Flushing,
NY
11358
Date: 12/2014
Type of tub install: Free-standing (clawfoot, legged)
Bathtub: Install a new bathtub (No existing bathtub)
Tile: Yes - I plan to install new tile
Part of larger remodel: Yes
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: New bathroom renovation
Project Location:
bayside,
NY
11355
Date: 11/2014
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: Yes
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: live in a coop and need management to approve, need contractor consumer affairs license, epa lead paint license, electrician license, plumbers license , and contractors workers compensation insurance cerificate and certifiacate of lisbility insurance
Project Location:
Flushing,
NY
11367
Date: 09/30/2014
Type of tub install: Shower / tub combo
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: The faucet in the tub needs a cartridge (it goes inside the faucet) replacement as the hot water is leaking.
Project Location:
Flushing,
NY
11354
Date: 08/2014
Type of tub install: Shower / tub combo
Bathtub: Install a new bathtub (No existing bathtub)
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: Yes
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: The existing bathtub has been removed. and bathtub is provided by owner. Would like to install the bathroom and connect plumbing.
Project Location:
Flushing,
NY
11367
Date: 05/2014
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Project Location:
Flushing,
NY
11354
Date: 04/2014
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Project Location:
Flushing,
NY
11354
Date: 03/2014
Type of tub install: Whirlpool / jetted tub
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: remove old (Jacuzzi brand )bathtub and replace with new one same size and shape . you will have to remove old tile from wall and replace and install new faucet fixture easy access from behind wall in closet for the plumbing
Project Location:
Flushing,
NY
11355
Date: 03/2014
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Project Location:
Flushing,
NY
11354
Date: 02/2014
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: i live in a co-op building. i want to replace my bath tub with a glass door shower.
Project Location:
Flushing,
NY
11355
Date: 09/21/2013
Type of tub install: Whirlpool / jetted tub
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: I have a jacquzi and I need to replace the rings around the bath tub.
Project Location:
Flushing,
NY
11367
Date: 08/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: Replacing Tub and surrounding tiles, mortar base and waterproofing,5x8 bathroom.
Project Location:
Flushing,
NY
11358
Date: 04/2013
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Property Owner: Yes
Are you updating a shower or a bathtub?: Both
Covered by Insurance: No
Comment: current shower leaks, need new shower, tiles, and bathtub redone but with same tub
Project Location:
Flushing,
NY
11367
Date: 04/2013
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: legalizing and existing structure for CO approval.
Project Location:
Flushing,
NY
11354
Date: 02/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: Yes
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Historical Work: No
Property Owner: Yes
Comment: Remodel bathroom
Project Location:
Flushing,
NY
11367
Date: 10/2012
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Interested in Green Alternatives: No
Property Owner: Yes
Are you updating a shower or a bathtub?: Bathtub
Comment: replace tub with shower