About this Page

 

We are rebuilding the library collection following our 2012 web migration. The collection provides easy access to public documents. Browse around. If you don't find what you're looking for, email [email protected] and ask if it's availalbe. You will receive a prompt response.

If the document you're looking for is older, check out our eLibrary Archive.

Library Collection

Collapse All Expand All

Water Management Analysis Report - Flood of September - October 1986

From late September through early October 1986, a storm system extending across the central plains of the United States caused flooding of unprecedented proportions in northeastern Oklahoma and southeastern Kansas, an area within the Tulsa District, U.S. Army Corps of Engineers. This report presents hydrologic and hydraulic data and analysis of the flooding and actions taken by the Tulsa District to control the flood waters.

Water Management Analysis Report - Flood of September - October 1986

Water Management Analysis Report - Flood of September - October 1986 (Appendix B)

Appendix B includes aerial photography of the flooded areas along the Arkansas River in the Sand Springs, Tulsa, Bixby, and Jenks areas in northeastern Oklahoma.

Water Management Analysis Report - Flood of September - October 1986 (Appendix B)

A semiannual publication prepared for members of congress outlining construction projects, operations and maintenance efforts, and authorized studies in the geographic area of the Tulsa District. Downloadable files are available from our Tulsa District Publications page.

Lake Texoma Recreational Fishery Phase III Final Report- December 2012

Area VI Feature Reevaluation Feasibility Scoping Meeting Documentation Red River Chloride Control Project Arkansas, Texas, Louisiana, and Oklahoma-September 2012

Area VI Red River Chloride Control M&I Report- January 2012

Area VI Red River Chloride Control M&I Report Appendix C- Engineering Analysis- January 2012

Area VI Red River Chloride Control M&I Report Appendix D- NED- January 2012

Area VI Red River Chloride Control M&I Report Appendix D- NED Cable Mountain- January 2012

Area VI Red River Chloride Control M&I Report Appendix D- RED- January 2012

Area VI Red River Chloride Control M&I Report Appendix D- RED Cable Mountain- January 2012

Area VI Evaluation Lake Texoma CASM Update- October 2011

Area VI Evaluation of Chloride Management Alternatives CASM Lake Texoma- May 2010

Review Plan - Red River Chloride Control Project, Elm Fork, Area VI General Reevaluation Report - March 2010 (Comments being accepted until Nov. 30, 2013)

Lake Texoma Recreational Fishery Phase II Final Report - December 2009

Lake Texoma Recreational Fishery Phase I Draft Report- September 2007

Area VI Evaluation of Chloride Management Alternatives CASM Lake Texoma- May 2010

Review Plan - Red River Chloride Control Project, Elm Fork, Area VI General Reevaluation Report - March 2010 (Comments being accepted until Nov. 30, 2013)

Lake Texoma Recreational Fishery Phase II Final Report - December 2009

Lake Texoma Recreational Fishery Phase I Draft Report- September 2007

  • The Dawning, A New Day for the Southwest: A History of the U.S. Army Corps of Engineers Tulsa District - 1975
  • Fifty Years Remembered: The First 50 Years of the Tulsa District U.S. Army Corps of Engineers - 1989
  • An Era of Change: The Tulsa District, U.S. Army Corps of Engineers, 1971-1997 

FINAL - Environmental Assessment, Wister Lake, Oklahoma, Aquatic Ecosystem Restoration Study, LeFlore County, Oklahoma - September 2009

DRAFT - Supplement to the Final Environmental Statement for the Operation sand Maintenance Program at Wister Lake and Poteau River, Oklahoma - June 2002