Paul and his crew did a fantastic job with our new driveway and we are very pleased with the result. When we started soliciting quotes to replace our old asphalt driveway, we were surprised at how expensive it would be. After seeing all the labor and care that went into the job, we now understand why. We believe that we paid a very fair price. After the contract was signed, they told us that work would begin on Tuesday at 7:30 AM and that is exactly what happened. The foreman introduced himself and his crew and told us what to expect in the next few days. We were always kept apprised of what work was coming up and when they would be on site. The whole job took about two weeks, including time for the concrete to cure. There were a lot of details to take care of: demolition and debris removal, relocating sprinkler pipes, excavating and constructing forms for the concrete pour and the brick trim, concrete pour and aggregate seeding, brick laying, filling in excavated areas, acid washing, and final cleanup. All along the way, Paul checked in with us and made sure we were satisfied with the work as it progressed. At one point, the crew had dry laid all the brick and we were checking out the pattern. I noticed that there would be a cut brick at the edge of the connecting walkway and commented on it. Two hours later, the whole brick placement had been redone to eliminate the cut entirely. They clearly wanted to do the job right. The crews were polite and considerate, always willing to answer questions, and clearly proud of their work. Our neighbors have commented on how nice the new driveway looks, and considering the noise and traffic that they had to put up with, that's a strong endorsement.