What is a reasonable payment schedule?
What is a reasonable payment schedule for a £8,000 job?
Should I give a deposit on confirmation of wanting a builder to do this work?
The job is estimated to take 3 weeks.
Many thanks
Additional Info: The builder I was thinking of using has asked for the following (I feel the 25% deposit is too high):
A deposit based on 25% of the total quotation (£8,000) is required on confirmation of the order, and 25% each week ending based on works completed.
Additional info: The builder is a member of FMB, so I am assuming he won't run off with the deposit!
Additional info: I see what you are all saying, but I am a good payer, but I guess the builder will not know this.
Thanks everyone for your advice.
19 Answers from MyBuilder Restoration & Refurb Specialists
Best Answer
Cheltenham • Member since 29 Oct 2008 • 34 jobs, 100% positive feedback
On a job to that value, and a time scale of only 3 weeks, I personally would not ask for anything up front, most good reputable builders hold trade accounts, so material etc can be booked out, and billed monthly, plenty of time to do the job and settle account.
But I will stress, we hear a lot about cowboy builders, but some customers can be just as bad when it comes to payments.
I have found over the years large organisations, estate agents etc are very late payers, sometimes withholding monies for 3/4 months.
No one can expect any decent tradesman to wait this long, so long as every thing has been done to spec.
There has got to be complete trust between the builder and customer, so it could be worthwhile to just draw up a small schedule of works and a stage payment.
I dont know what your job is ,but if it was an extension I would agree on a payment when footings up to dpc and floor slab, 2nd payment superstructure with roof on, final payment upon completion.
If its a smaller job, agree to pay for material, skips, plant etc when it has arrived on site.
This way it benefits both of you, builder covered for materials so will only loose his labour cost if you stalled payments, and if he walked of site you have the materials.
I havent had any of these problems, but there could be a first time, and there is always the small claim courts, to recover costs, which works well for both parties.
Answered 12th Apr 2011
Goldcrown Building Contractors
Brackley • Member since 19 Nov 2008 • No feedback
I am also registered with the FMB who have inspected my work on several occasions. Belonging to such an organisation is good for the builder and is good for the clients he or she is working for. A Builder is a Builder not some one who gives interest free credit untill the job is completed.To ask for a 25% deposit and provide a scheduled payment plan through out the job is not unresonable. He or she would be expected to give a reciept for payment signed by both parties. I have not long ago completed a job on a no deposit plan and lost a lot of money through not been paid. I would never again start a job with out a deposit confirmed by my accountant and lawyers. Any one who says a good builder should have the resources to sustain and finish the job with out a deposit or interim payments is not living in the real world. We all have commitments to meet and need regular income to sustain life in general. All reputable Builders do not have Merchant accounts i personally pay as i go then i know exactly from day to day where i am on any job i under take.
Answered 13th Apr 2011
TP Plastering & Building Services
Ware • Member since 24 Nov 2009 • 1 job, 100% positive feedback
Being a member of the fmb means little. just that the builder has paid his 500 quid. a year for a crappy mag and a load of junk mail. no deposit, fair payments as soon as work starts.
Answered 16th Apr 2011
Hull • Member since 3 Dec 2008 • 4 jobs, 100% positive feedback
i took a £2000 pound deposit last august for a job and still waiting for the balance of £6,400 on completion so i can see were the builder is coming from ,customers are notorious slow payers and forget us tradesman have mortgages and bills just like them
Answered 13th Apr 2011
Wolverhampton • Member since 2 Jun 2008 • 5 jobs, 60% positive feedback
I agree with golden crown we too are members of the FMB and have to adhere to strict critia. I normally take 40% deposit for any work if its a extension this would generaly get us up to roof hieght. Even though most builders have trade/credit accounts this doesnt mean we should pay for the clients materials. We always use legaly binding contracts when collecting a deposit and as FMB Members know the deposits are coverd by insurance backed gaurentee if anything did go wrong.
Answered 21st Apr 2011
New Romney • Member since 22 Jan 2014 • 20 jobs, 90% positive feedback
I love the way some are saying 'A good builder...' Its up to the business and builder how he/she takes payments, I take a deposit to cover materials and hire etc, My customers have been happy with this arrangement for over 20 yrs, so please don't invent your own criticism or rulings for payments. A good builder is an honest and professional business who builds to high standards, I have to cover my end because as much as most customers are good decent people I have been stung in the past with those trying it on and not paying. After all, you don't go to Tesco and get your shopping and say at the till 'hey mate, I'll pay ya next week if ok'...it's a business and you cannot be judged by how good or bad you are on how you ask for your payments-proof is in the end result.
Answered 20th Feb 2014
Coventry • Member since 5 Jan 2010 • 9 jobs, 100% positive feedback
A good well set up builder should have the resources to finance his own work.
However in todays troubled times getting paid is a worry and it's all about risk reduction, for both parties.
My advice is a small deposit say £1,000 if it is asked for. Then a substantial interim payment if you are happy with progress after a couple of weeks, of say 4-5 K, leaving a reasonable sum to make sure the job is completed. (Finishing a job is always the hardest part for a builder, when most of the value is complete and just the snagging to do).
Martyn Blair
Answered 12th Apr 2011
Aylesbury • Member since 30 May 2008 • 39 jobs, 97% positive feedback
I get materials paid for up front then staged payments. I never used to, untill i lost £7,500 when customers would not pay, their are dodgy builders out their and dogy customers. talk to your builder and come to an arangement that suits you both.
Regards Roger
Answered 21st Apr 2011
My advice is NO deposit , get a firm time schedule for the work , divide the total amount into weekly payments or four equal payments at quarter intervals . remember the job is based on trust both ways . If you have any reasons to think you shouldnt pay raise the issues at each stage and once sorted make a payment. Put the agreement down on paper and both sign a copy . most importantly make sure both parties are completely agreed as to what the cost includes, its the small grey areas that always cause a problem.
Answered 13th Apr 2011
Crewe • Member since 20 May 2010 • 5 jobs, 100% positive feedback
Hi there,
In my opinion I do not believe in any federation. I have been in the trade 30 years - father and grandfather prior and never have we dealt with them.
We ask for a % of materials up front and stage payments there-after.
As long as we have good customer satisfaction - the payments come naturally.
If it were an extension then yes I would agree as we deal with them conracts only and 25% is what we ask for as the cost of an extension is classed as large works. On a small works such as £8000.00 we would ask for no more than 15% up front.
You must bare in mind though that for every 10 bad builders that you see on these T.V programmes there are over 20 good ones or it could be just a case of a newly established business as we were and just need that bit of cash to commence.
As a paying customer you will know if it's right or wrong as we builders do with our potential customers.
Thanks
Paul
Answered 16th Apr 2011
Lostock Hall • Member since 26 Feb 2008 • 2 jobs, 100% positive feedback
hello
i sort of agree with martyn i would ask for a 30% deposit end of week 1 £2000 end of week 2 £2000 and a balance on completion its not just about a builder financing the job its also about the customer committing to the builder TRUST is the big thing in any project
steve
Answered 12th Apr 2011
RG CARPENTRY AND BUILDING 24HR LOCKSMITH
Huntingdon • Member since 31 Oct 2008 • 117 jobs, 100% positive feedback
i would always take a deposit and stage payments all well and good having trade acounts but are also rogue customers as well as rogue traders any works undertaken for the client will be paid for by client - i am also member of fmb but that wont get you paid
Answered 9th May 2011
We normally offset a big deposit with retainer at the end.
So we take 10% deposit and 5% retainer or 20% deposit and 10% retainer.
This way the builder has all the money to get the big push started and then the client has piece of mind that at the end they have something to hold on to.
Answered 29th Jan 2013
Morpeth • Member since 12 Jan 2010 • 16 jobs, 100% positive feedback
Agree a deposit, an interim payment and a payment upon conclusion when all snagging is done.
Regards Mark
Answered 12th Apr 2011
Middleton • Member since 24 Apr 2017 • 21 jobs, 90% positive feedback
We would normally ask for 25% on Contract and rest on Completion. But we also offer an independent Deposit protector from the DGCOS
Answered 29th Apr 2017
Going for strict payment schedule will reduce a risk from both parties. Even for short period of project is advisable to provide reasonable payment plan.
Answered 19th Nov 2017
West Bromwich • Member since 12 Jan 2009 • 31 jobs, 100% positive feedback
After running a ltd company doing extensions and loft conversion for 15 years , my Attitude towards clients has changed , i would never take a deposit , when i first started out , work was always done on small stage payments , but as my company has grown , ive found this policy to be Fatal to my buissness as the clients often try to get out paying if not for the job for extras and its usually the builder who losses in reality, we must stop this practice, as most clients are unreasonable, and have unrealistic expectations of the works in hand and often use your final payment as a bargin chip
Answered 15th May 2019
Finestone roofers and decorators Ltd
Wimbledon • Member since 26 Jan 2017 • 149 jobs, 99% positive feedback
The best payment for a job at the amount of £8000 will be in three individual payments 30% 30% and 40% on completion providing the customer is happy with the overall job
Answered 2nd Feb 2017
Tooting • Member since 14 Jan 2019 • No feedback
We would not tend to ask for a deposit upfront unless it was a extremely big job even so maybe after footings etc had been put in place and materials were on sight we might ask for around 15% to 20% percent of payment
Answered 24th Jan 2019
Related Questions
-
What should be included in a payment schedule?
Hi, I'm having a extenstion done to my house and the builder has given me a payment schedule. There is no breakdown in the...
-
Is there a 3 PHASE inverter out there that can manage a possible output of up to 60.000 watts for a tanning shop?
I know we can change the power supply via energy company but this is been quoted as a 6 week minimum wait and would rather get set...
-
7 weeks over schedule on an 8 week job - is it fair to deduct payment?
We have had a builder in to do a number of jobs internal & external, including making good on a flat roof & external rendering...
-
Pay schedule. What is reasonable / standard
I want to convert a steading, all paper work is done including building warrant etc. I have asked a builder to pick and point...
![MyBuilder](https://webcf.waybackmachine.org/web/20210729061158im_/https://static.mybuilder.com/bundles/mybuilderapplication/images/mb-site-logo.png)
Post your job to find high quality tradesmen and get free quotes
Question Categories
- All Questions
- Architectural Services
- Bathroom Fitting
- Bricklaying
- Carpentry & Joinery
- Carpet & Lino
- Central Heating
- Chimneys & Fireplaces
- Conservatories
- Conversions - General
- Damp Proofing
- Demolition & Waste Clearance
- Driveways
- Electrical
- Extensions
- Fascias, Soffits & Guttering
- Fencing
- Gas Work
- Groundwork & Foundations
- Handyman
- Hard Flooring
- Insulation
- Kitchen Fitting
- Landscape Gardening
- Locksmiths
- Loft Conversions
- New Builds
- Painting & Decorating
- Plastering
- Plumbing
- Restoration & Refurbishment
- Roofing
- Security Systems
- Stonemasonry
- Tiling
- Tree Surgery
- Windows