Recent Job Requests for Flooring & Carpet
Contractors in Louisville, KY
Project: Install Wood or Stone Laminate Flooring
Date: 03/23/2019
Materials Provided by Customer: Yes
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project: Install Carpeting
Date: 03/23/2019
Customer Need: Quotes - I'm ready for competing quotes
What kind of location is this?: Home/Residence
Materials Provided by Customer: No
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Comment: Install carpet in one basement room
Project: Install Wood or Stone Laminate Flooring
Date: 03/23/2019
Materials Provided by Customer: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Ground floor condo. Would like laminate in the living/dining room
Project: Repair or Partially Replace Wood Flooring
Date: 03/23/2019
Description of Damage: Loose, gaps or missing pieces
Type of Wood: Plank
Refinish after Repair?: Yes
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Had wall removed and need small area floor replaced.
Project: Repair or Partially Replace Wood Flooring
Date: 03/23/2019
Nature of Project: Repair existing flooring
What kind of location is this?: Home/Residence
What type of flooring material do you want to install or repair: Hardwood
Have you already purchased the materials for this project?: No
Rooms Included:: Kitchen
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Historical Work: No
Covered by Insurance: Yes
Property Owner: Yes
Comment: This entails an area of 'real' hardwood flooring about 3' by 4' or so in the kitchen damaged by a dishwasher leak. Although the damage is not severe, the floor boards are slightly buckled and discolored. The difficult will be in matching the stain.
Project: Install Vinyl or Linoleum Sheet Flooring or Tiles
Date: 03/22/2019
Vinyl Type Selected: Sheet vinyl
Materials Provided by Customer: No
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Project: Install Wood or Stone Laminate Flooring
Date: 03/22/2019
Materials Provided by Customer: No
Style of Flooring: Simulated hardwood
Rooms of Project: Living room, Dining room, Kitchen, Hallway, Entry, Family room
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Project: Install Wood or Stone Laminate Flooring
Date: 03/22/2019
Materials Provided by Customer: No
Style of Flooring: Simulated hardwood
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Project: Install Carpeting
Date: 03/22/2019
Customer Need: Quotes - I'm ready for competing quotes
What kind of location is this?: Home/Residence
Materials Provided by Customer: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project: Repair, Refasten, or Stretch Carpeting
Date: 03/22/2019
Description of Problem: Needs re-stretching
Extra Carpet: Yes
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Comment: I have one room and hall with carpet that needs re-stretching...approx. 186 sq. ft.