Bathroom Remodelers in El Paso, TX
Prescreened Bathroom Remodeling Contractors in El Paso, TX
Are You a Quality Pro? Join Our Network
Premium Remodeling and Construction
(866) 215-6146
Areas of Expertise
- Kitchen Remodels
- Bathroom Remodels
- Basement Remodels
- Additions
- Rennovations
HQ- Builders, LLC
(866) 843-8982
Areas of Expertise
- Remodel, New Construction, Roofing, All Kinds of Tiling, Drywall, Spraying Pattern,
- Painting of Interior and Exterior, Stucco, Insulating, Installation of New Windows and Doors,
- Concrete, (Also Stamped One), All Our Sub-Contractors Are Licensed, Bonded and Insured.
- Minor Plumbing!
Black Diamond Construction
(877) 341-6296
Areas of Expertise
- Home Remodeling
- Bathroom remodel
- Additions
- Home Renovation Projects
- Roofing
SWGRC, LLC
(888) 235-3572
Areas of Expertise
- Home Additions
- Kitchen Remodels
- Bathroom Remodels
- Garage Remodels
- concrete
Unscreened Addition & Remodeling Contractors in El Paso, Texas
Things to Consider Before You Start a Bathroom Makeover Project:
- How extensively do you want to remodel your bathroom?
- Shower / Bath
- Toilet
- Cabinets / Vanity
- Countertops
- Sinks
- Flooring
Recent Requests for Bathroom Renovation Contractors in El Paso, Texas:
Project Location:
El Paso,
TX
79936
Date: 01/12/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Redo bathroom, tile, replace sink, toilet, vanity, etc.
Project Location:
El Paso,
TX
79934
Date: 01/11/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Take tub out and build walk in shower with wall by toilet. Replace toilet, tile, cabinets, countertop, sink, widen door from 32â to 34â, and tile walls up to seven feet. I also need grab bars installed.
Project Location:
El Paso,
TX
79925
Date: 01/11/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: The house was built in the 60âs, so the master baths at that time were small in size. A termite extermination has been done. The walls are in need of replacement, as are the fixtures, sink, shower,cabinets, door, and toilet. Everything must go down to the studs. I want Large tile floor. I would like to buy middle priced items. I do have some ideas for the room that might not fit the budget. That will have to be worked out with the contractors.
Project Location:
El Paso,
TX
79925
Date: 01/11/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: change shower and toilet
Project Location:
El Paso,
TX
79912
Date: 01/11/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I would like to get an estimate for bathroom remodel
Project Location:
El Paso,
TX
79925
Date: 01/11/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
El Paso,
TX
79936
Date: 01/11/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Project Location:
El Paso,
TX
79915
Date: 01/10/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Project Location:
El Paso,
TX
79924
Date: 01/09/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Remodel two bathrooms
Project Location:
El Paso,
TX
79912
Date: 01/09/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Want to add a powder room to the house. We need advice as to where to put it and if we could add a small shower
Project Location:
El Paso,
TX
79924
Date: 01/09/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: I need to add a bathroom to main floor of tri-level house.
Project Location:
EL PASO,
TX
79927
Date: 01/09/2019
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
EL PASO,
TX
79924
Date: 01/08/2019
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
El Paso,
TX
79930
Date: 01/07/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Updating older bathroom for a modern and functional look.
Project Location:
El Paso,
TX
79936
Date: 01/07/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Change the tub to shower with glass doors, remove window
Project Location:
El Paso,
TX
79936
Date: 01/07/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: WOULD LIKE TO EXTENT THE RESTROOM INTO A CLOSET SPACE.
Project Location:
El Paso,
TX
79912
Date: 01/06/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: renovate bathroom. Simple, sleek and modern.
Project Location:
El Paso,
TX
79936
Date: 01/04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Resolve bathtub leak and refurbish existing layout.
Project Location:
El Paso,
TX
79912
Date: 01/03/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: Change bath tub to full enclosed shower, with bench at back, safety bars, replace faucet, shower head, tile the floor and change out the vanity as well as pipes.
Project Location:
El Paso,
TX
79924
Date: 01/03/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes