Company Logo

F.E.Q. Construction And Excavating

9001 Petronas Drive, Albuquerque, NM 87121
(505) 203-3712
5.0 | 2 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Albuquerque

BUSINESS OVERVIEW

F.E.Q. Construction And Excavating, is your best choice for all you Commercial Building and Home Improvement needs! We are Albuquerque's Premier profession contract company! We take pride in providing the highest quality finished projects at fair and reasonable prices! Our customer's complete satisfaction is our top priority! Call us today for a free estimate!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

F.E.Q. Construction And Excavating
Showing 1-2 of 2
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
5.0   |  
Review by in Cedar Crest, NM
FEQ worked around my schedule, cleaned up after their work every day; started and finished on schedule; and the remodel made a world of difference in my guest/hall bath.
Was this review helpful?  
5.0   |  
Review by in Albuquerque, NM
I had squeaky floors and stairs in a house less than 5 yrs young. FEQ completely replaced the decking, added insulation and had new carpet installed in three days. They moved the furniture in and out. The upstairs and stairs are now solidly fixed. Amazing customer service all the way.

1 of 1 users found this review helpful.

Was this review helpful?  
Showing 1-2 of 2
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Albuquerque, NM:


Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 12/02/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 12/02/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Remodel a Kitchen
Location: Albuquerque, NM
Date: 12/02/2017
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 12/02/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 12/01/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel or Renovate One or More Rooms
Location: Albuquerque, NM
Date: 12/01/2017
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Bathroom(s)
Design Preparation: Sketches and/or basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Renovate or Repair a Home
Location: Albuquerque, NM
Date: 11/2017
Project Description: Several repair projects of varying nature
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Remove and replace hanging closet doors in four rooms with regular doors or accordions or something else - or repair the damn things!!

Project: Renovate or Repair a Home
Location: Albuquerque, NM
Date: 11/2017
Project Description: Major home repair project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: We have a duplex which has been gutted and there are rotting 2x4s which need to be replaced as well as a rafter beam that needs repaired and multiple doorways to be reframed and kitchen walls and bar to be built.

Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 11/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: The shower is a corner shower and has two walls tiled with slate - which can be retained. One wall is currently frame up to approximately 3 ft high and finished with glass brick - and glass brick rounds the corner to meet the shower door. I'd like to replace that wall and the shower door with clear glass enclosure. A new shower floor needs to be laid - and I think a black ceramic tile would work well. It also needs to have the shower mixer valve / controls replaced - and I'd like the European style of the adjustable hand held device that moves up or down a vertical rod. There is a pedestal sink and no cabinet on a 6 ft long wall opposite the shower door and toilet. I would like to have a cabinet installed in that space - with either one or two sink basins and a nice counter top. A mirror above the cabinet and new lights above the mirror would complete the remodel.

Project: Remodel a Bathroom
Location: Albuquerque, NM
Date: 11/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Plumbing is already installed. Need custom shower pan with bench. Bathroom is down to studs with new pocket door framed . Electric is roughed in awaiting fixtures. Need tiling, shower wallboards, rubber lining, and sheetrock .