Shower Pan Installers in Phoenix, AZ
Prescreened Shower Pan and Base Installers in Phoenix, AZ
Wyman Plumbing & Mechanical, LLC
(866) 570-0151
3715 West Memorial Drive
Anthem, AZ 85086
Serving Phoenix, AZ
3715 West Memorial Drive
Anthem, AZ 85086
Serving Phoenix, AZ
Leak Doctor Plumbing, LLC
(480) 567-9545
3071 East Beechnut Place
Chandler, AZ 85249
Serving Phoenix, AZ
3071 East Beechnut Place
Chandler, AZ 85249
Serving Phoenix, AZ
Holtzman Home Improvement, LLC
(480) 459-2782
1605 West University Drive, Suite 109
Tempe, AZ 85281
Serving Phoenix, AZ
1605 West University Drive, Suite 109
Tempe, AZ 85281
Serving Phoenix, AZ
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Reviews of Phoenix Shower Pan Contractors
Know any great Shower Pan Contractors in the Phoenix area? Let us know about them and you might be eligible to receive a Amazon.com gift certificate. Refer A Pro today!
Related Projects in Phoenix, Arizona
More Phoenix PlumbersMore Arizona Plumbers
More Arizona Shower Pan Contractors
Unscreened Plumbers in Phoenix, Arizona
Things to Consider Before You Install a Shower Pan:
- Why do you need a new shower pan?
Adding a new shower
Changing the footprint of an existing shower
The old one leaked
Updating the look
- Is this project part of a larger remodel?
- What type of shower is it?
Dual shower
Free standing
Steam shower
- What material is the shower surround made of?
Fiberglass
Plastic
Stone
Tile
![Are You a Quality Pro? Join Our Network](/web/20170703235808im_/http://www.homeadvisor.com/images/consumer/xmd/lead-stream-banner.png)
Recent Requests for Shower Pan and Shower Base Installation or Construction in Phoenix, Arizona:
![New Lead](http://webcf.waybackmachine.org/web/20170703235808im_/http://cdn1.homeadvisor.com/images/consumer/xmd/new-label.png)
Project Location:
Phoenix,
AZ
85014
Date: 06/2017
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: We need to tear out and replace our current shower. The previous owners did not install a shower pan so we need to fix the shower. Current tile is slate and we'd like to stay with the slate when it's replaced. We plan on keeping current showerhead. Shower is roughly 3 ft wide x 7 feet long.
Project Location:
Phoenix,
AZ
85020
Date: 06/2017
Why do you need a new shower pan?: Changing the footprint of an existing shower, The old one leaked
Part of larger remodel: No
What type of shower is it?: Free standing
What material is the shower surround made of?: Stone
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: 4x4 shower and need to replace the shower pan and need a quote
Project Location:
Phoenix,
AZ
85020
Date: 06/2017
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks
Comment: Remove old tile. New backer board , shower pan. Raise shower head. Repair bathroom walls.
Project Location:
Phoenix,
AZ
85027
Date: 06/2017
Why do you need a new shower pan?: The old one leaked, Updating the look
Part of larger remodel: No
What type of shower is it?: Free standing
What material is the shower surround made of?: Tile
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: new shower pan .. some plumbing... new tile
Project Location:
Phoenix,
AZ
85044
Date: 05/2017
Tile: Yes - I plan to install new tile
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: remove a pre formed shower and replace with new tiled walls, base and fixtures and door.
Project Location:
Phoenix,
AZ
85044
Date: 05/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Covered by Insurance: No
Comment: remove a pre formed shower and replace with new tiled walls, base and fixtures and door.
Project Location:
Phoenix,
AZ
85028
Date: 04/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Covered by Insurance: Yes
Comment: I have a deep, two head shower stall that had a leak in the floor pan. Insurance will cover putting in a new shower so I just need to find a contractor. The shower had floor to ceiling 18" tiles and is currently partially demoed. More than half of the wall tile has been removed but the remainder needs to be completed along with the shower pan. A new shower will need to be created in the same location, just new pan and tile. There was some damage to the framing of the shower due to the leak. Please contact asap as I need to submit the quote for repairs to my insurance company to get the work started.
Project Location:
Phoenix,
AZ
85020
Date: 04/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Covered by Insurance: No
Comment: tear out all tile replace shower pan redo tile install grab bars and seat and new fixtures
Project Location:
Phoenix,
AZ
85021
Date: 04/2017
Part of larger remodel: Yes
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Phoenix,
AZ
85022
Date: 04/2017
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Remove and replace 3 sided fiberglass shower enclosure with newer rounded style sliding fiberglass doors. Fiberglass base. Compltete kit purchased from Home Depot.
Project Location:
Phoenix,
AZ
85048
Date: 04/2017
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: I need an estimate for installing a shower pan. About 34x40.5 size.
Project Location:
Phoenix,
AZ
85022
Date: 03/2017
Why do you need a new shower pan?: The old one leaked
Part of larger remodel: No
What type of shower is it?: Free standing
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: Shower pan is cultured marble. It has two cracks. I'm selling the house and need it replaced asap
Project Location:
phoenix,
AZ
85015
Date: 03/2017
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Historical Work: No
Property Owner: Yes
Comment: bottom layer of some tiles came off - will need back boeard replaced for lower level tiles and not sure if have a shower pan issues
Project Location:
Phoenix,
AZ
85018
Date: 02/2017
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: I had my shower redone last year. Unfortunately, it was done by a handyman not a shower expert. I am having some issues with appropriate drainage in the shower pan and aesthetic of the tile. I would also like to add in a shower door for more water protection if possible. Thank you!
Project Location:
Phoenix,
AZ
85044
Date: 01/2017
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: Yes
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: The shower pan has a crack. If it can be repaired or a new pan put in the shower I would be interested. Otherwise I will need to replace the shower stall. The shower is a plastic(?) unit not tile.
Project Location:
Phoenix,
AZ
85053
Date: 12/2016
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes
Comment: replace shower pan
Project Location:
Phoenix,
AZ
85027
Date: 11/2016
Why do you need a new shower pan?: Changing the footprint of an existing shower
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Comment: Shower pan liner
Project Location:
Phoenix,
AZ
85022
Date: 11/2016
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks
Comment: Raise sunken shower to curbless level with masterbath floor. Fill in sunken tub area. Install shower pan, drain, shower heads, faucets. Prepare the shower area for tiling.
Project Location:
Phoenix,
AZ
85027
Date: 10/2016
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: Yes
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Historical Work: No
Property Owner: Yes
Comment: Remove existing shower tile, sliding doors, shower pan. Install new shower pan, fixtures, doors, and use new Cultured marble walls/sides
Project Location:
Phoenix,
AZ
85050
Date: 09/2016
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Historical Work: No
Property Owner: Yes
Comment: Existing corner shower adjacent to tub needs replacement. Current shower has faux marble walls with shower pan. Would like new pan and walls installed.