Bathroom Remodelers in Warrington, PA
Prescreened Bathroom Remodeling Contractors in Warrington, PA
Pattison Remodeling Group, LLC
References Available
(267) 573-7668
PO Box 208
Willow Grove, PA 19090
Serving Warrington, PA
PO Box 208
Willow Grove, PA 19090
Serving Warrington, PA
Zwolinski Quality Construction
(215) 239-9535
166 North Walnut Street
Silverdale, PA 18962
Serving Warrington, PA
166 North Walnut Street
Silverdale, PA 18962
Serving Warrington, PA
On Call Contracting Services, LLC
(267) 573-7080
P.O. Box 3181
Ambler, PA 19002
Serving Warrington, PA
P.O. Box 3181
Ambler, PA 19002
Serving Warrington, PA
Easy Bath Solutions, LLC
References Available
(267) 573-6874
614 Winding Road
Hatboro, PA 19040
Serving Warrington, PA
614 Winding Road
Hatboro, PA 19040
Serving Warrington, PA
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Reviews of Warrington Bathroom Remodelers
Project: Remodel a Bathroom
Lansdale, PA
Lansdale, PA
We got our bathroom completely redone with a new vanity, sink, tub, and tile and it looks great. James did a wonderful job and I would recommend him again. The project took longer than expected because the plumbing was old and they ran into some problems (which understandably is not his fault), but I only gave four stars because even though we knew these problems would cost us more money than what the original contract stated, the extra costs ended up being way more than we expected them to be. Thanks for your hard work.
Project: Remodel a Bathroom
philadelphia, PA
philadelphia, PA
Very profesional crew and the bathroom came out Great
Project: Remodel a Bathroom
Doylestown, PA
Doylestown, PA
Very professional, reliable, skilled in all necesary disciplines and plesant to work with.
Related Projects in Warrington, Pennsylvania
More Warrington Addition & Remodeling ContractorsMore Pennsylvania Addition & Remodeling Contractors
More Pennsylvania Bathroom Remodelers
Unscreened Addition & Remodeling Contractors in Warrington, Pennsylvania
Things to Consider Before You Start a Bathroom Makeover Project:
- How extensively do you want to remodel your bathroom?
- Shower / Bath
- Toilet
- Cabinets / Vanity
- Countertops
- Sinks
- Flooring
Ideas & Inspiration from Warrington Addition & Remodeling Contractors
This Project took a total of 2 Days, first day rough in plumbing and drywall, second day tile & set fixtures.
If you ...
These amazing bathrooms are functional as they are beautiful and can be customized to your taste and style. ...
Recent Requests for Bathroom Renovation Contractors in Warrington, Pennsylvania:
Project Location:
WARRINGTON,
PA
18976
Date: 06/2016
Consumer Owns Home: Yes
Desired Completion Date: 7 - 8 weeks
Project Location:
Warrington,
PA
18976
Date: 06/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Two full bathrooms on second floor need to be remodeled. The hallway bathroom has a laundry closet that currently has our washer and dryer in it. Our master bath currently has one sink but we're considering adding another one if the space allows it.
Project Location:
Warrington,
PA
18976
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Install new bathroom already stubbed out
Project Location:
Warrington,
PA
18976
Date: 05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: We are tiling our bathroom and adding puck lights and want the closet torn out and framed for shelves
Project Location:
Warrington,
PA
18976
Date: 05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Bathroom remodel
Project Location:
warrington,
PA
18976
Date: 04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: master bath 25 years old.
Project Location:
Warrington,
PA
18976
Date: 04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Removal of an old and install or a new fiberglass shower/tub. Replace two toilets. Install new shower door. Replace PVC for kitchen sink.
Project Location:
Warrington,
PA
18976
Date: 04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Project Location:
Warrington,
PA
18976
Date: 03/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: looking for a complete remodel of our kids bathroom. It includes a shower/tub, floor, separate powder room with double sink vanity. I am on a budget!
Project Location:
Warrington,
PA
18976
Date: 03/2016
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Warrington,
PA
18976
Date: 02/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Updating a dated bathroom for house resale.
Project Location:
Warrington,
PA
18976
Date: 01/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: 2 bathrooms projects both involving new shower areas, new vanity, new sink, new flooring, new toilets, new walls to remove current popcorn from all sides and ceiling.
Project Location:
Warrington,
PA
18976
Date: 01/2016
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Warrington,
PA
18976
Date: 01/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Project Location:
Warrington,
PA
18976
Date: 01/2016
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Warrington,
PA
18976
Date: 01/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: 1 Bathroom - - replace floor tiles - install new toilet - install new vanity 1 Powder room - replace floor tiles - install new toilet - install new vanity
Project Location:
Warrington,
PA
18976
Date: 12/2015
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Full remodel of a master bathroom
Project Location:
Warrington,
PA
18976
Date: 12/2015
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: take out bathtub, use existing drain for new walk in shower, with one fixed pain. Like an open shower. Remove exiting shower. replace with closet, or more shelving.
Project Location:
Warrington,
PA
18976
Date: 10/2015
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Full renovation of a 5&7 bathroom: including replacement of the tub, tiling walls and floor, replacement of vanity, faucet and toilet. Plumbing alterations in the tub to change from widespread faucet to a single handed one.
Project Location:
Warrington,
PA
18976
Date: 09/2015
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible