Bathroom Remodelers in Riverside, CA
Prescreened Bathroom Remodeling Contractors in Riverside, CA
AMW Construction, Inc.
(760) 691-8883
14921 Meridian Place
Moreno Valley, CA 92555
Serving Riverside, CA
14921 Meridian Place
Moreno Valley, CA 92555
Serving Riverside, CA
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Reviews of Riverside Bathroom Remodelers
Project: Remodel a Bathroom
Riverside, CA
Riverside, CA
Rick is outstanding he provides quality service and materials
Project: Remodel a Bathroom
Riverside, CA
Riverside, CA
We contracted Rick to have our shower done and it is so beautiful and perfect. He know the best people for the job every step of the way. All very professional and they take great pride in their work and rightly so. I am definitly going to use La Casa Bella Desighn for any future projects.
Project: Remodel a Bathroom
Riverside, CA
Riverside, CA
Rick and his crew had my new bathroom in place less than two weeks after I requested quotes from Servicemagic. They were very helpful and picked out just what I wanted, just from having my vague description :) The financing option was very handy as we couldn't have afforded it otherwise. Thanks!
How Much Does it Cost to Remodel a Bathroom in Riverside?
Average Price to Remodel a Bathroom:
$6,324 - $12,588
Project Timeline: 3 Weeks - 4 Weeks
Related Projects in Riverside, California
More Riverside Addition & Remodeling ContractorsMore California Addition & Remodeling Contractors
More California Bathroom Remodelers
Unscreened Addition & Remodeling Contractors in Riverside, California
Things to Consider Before You Start a Bathroom Makeover Project:
- How extensively do you want to remodel your bathroom?
- Shower / Bath
- Toilet
- Cabinets / Vanity
- Countertops
- Sinks
- Flooring
Recent Requests for Bathroom Renovation Contractors in Riverside, California:
Project Location:
Riverside,
CA
92506
Date: 07/15/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Project Location:
Riverside,
CA
92506
Date: 07/15/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Project Location:
Riverside,
CA
92509
Date: 07/13/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: remodel 1976 original bathroom
Project Location:
Riverside,
CA
92503
Date: 07/11/2016
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
RIVERSIDE,
CA
92507
Date: 07/10/2016
Desired Completion Date: 5 - 6 weeks
Consumer Owns Home: Yes
Project Location:
Riverside,
CA
92506
Date: 07/10/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: update 2 and 3/4 baths with new tiling, toilets, baths, shower and floor. Medium quality materials.
Project Location:
Riverside,
CA
92504
Date: 07/10/2016
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92503
Date: 07/09/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Project Location:
Riverside,
CA
92506
Date: 07/07/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: looking to remodel master bedroom bathroom
Project Location:
Riverside,
CA
92506
Date: 07/05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: R&R floors, walls, shower, drain, supply lines, fixtures, cabinet. Remove below floor tub and frame in to floor level. Install recessed lighting, electrical, vents.
Project Location:
Riverside,
CA
92501
Date: 07/04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92503
Date: 07/04/2016
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Project Location:
Riverside,
CA
92508
Date: 07/04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: I would like to replace the existing tub in the master bathroom with a tile shower with a frameless glass door. I would also like to tile the floor of the master bathroom (100 sq. ft) and my kids's bathroom (50 sq. ft) as well.
Project Location:
Riverside,
CA
92506
Date: 07/03/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Complete bathroom remodel
Project Location:
Riverside,
CA
92506
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92507
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92504
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92503
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Riverside,
CA
92506
Date: 06/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Project Location:
Riverside,
CA
92506
Date: 06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I have a house built in 1978, with two (back-to-back) bathrooms not much updated since. I would like to do both at once. I would like to choose materials and do my own painting and lighting, so the job will include floor and shower tile, vanities, medicine cabinets, sinks, plumbing, and fixtures. I have new toilets in place. I'm in the mid to upper mid-range for material choices.