Bathroom Remodelers in Miami, FL
Prescreened Bathroom Remodeling Contractors in Miami, FL
R M Contractors, Inc.
References Available
(305) 508-9243
2920 Northwest 14th Street
Miami , FL 33125
2920 Northwest 14th Street
Miami , FL 33125
Statewide Homes, LLC
References Available
(877) 341-6193
13611 South Dixie Highway 109
Miami , FL 33176
13611 South Dixie Highway 109
Miami , FL 33176
Alligator Construction, Inc.
References Available
(866) 715-6054
2500 Southwest 92 place
Miami , FL 33165
2500 Southwest 92 place
Miami , FL 33165
Are You a Home Improvement Professional?
Learn how we can help your businessSee recent jobs & leads
Reviews of Miami Bathroom Remodelers
Project: Remodel a Bathroom
Miami, FL
Miami, FL
Always right on time, Very Professional to work with. Area was masked off and job site was cleaned up every day.
Project: Remodel a Bathroom
Miami, FL
Miami, FL
My entire remodeling experience with Habify was outstanding. From start to finish, each member of the Habify team was knowledgeable, professional and courteous. Each step of the way, they communicated with questions and updates, so I felt confident that my condo renovation was in good hands. Also, with Habify's commitment to using environmentally sustainable products, you can feel good about your project. I have had kitchens remodeled by "big box" stores, and Habify's price is comparable, but the experience and the end result with Habify is far superior.
How Much Does it Cost to Remodel a Bathroom in Miami?
Average Price to Remodel a Bathroom:
$6,000 - $7,000
Project Timeline: 4 Weeks - 5 Weeks
Related Projects in Miami, Florida
More Miami Addition & Remodeling ContractorsMore Florida Addition & Remodeling Contractors
More Florida Bathroom Remodelers
Unscreened Addition & Remodeling Contractors in Miami, Florida
Things to Consider Before You Start a Bathroom Makeover Project:
- How extensively do you want to remodel your bathroom?
- Shower / Bath
- Toilet
- Cabinets / Vanity
- Countertops
- Sinks
- Flooring
Ideas & Inspiration from Miami Addition & Remodeling Contractors
This is a luxury project that was built on 2006 in Miami. Actually this is one of our state of the art projects and we ...
Recent Requests for Bathroom Renovation Contractors in Miami, Florida
Project Location:
Miami,
FL
33131
Date: 04/08/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Tile removal and replacement. Structure to hold shampoo. New door. New shower head and faucet. Tile extended to the floor of the bathroom
Project Location:
Miami,
FL
33157
Date: 04/08/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Miami,
FL
33177
Date: 04/08/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Miami,
FL
33126
Date: 04/08/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: No
Comment: Only need to replace toilet & vanity including countertops for 2 bathrooms
Project Location:
Miami,
FL
33143
Date: 04/07/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: We would like to take out the existing tub, tiles, vanity, toilet and replace with all new (maintaining layout).
Project Location:
Miami,
FL
33136
Date: 04/07/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Need to replace current shower with a single man fiber glass with sliding door.
Project Location:
Miami,
FL
33179
Date: 04/07/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Project Location:
Miami,
FL
33101
Date: 04/06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: More than 2 months
Property Owner: Yes
Comment: Repair tub fill neck that has caused water damage to wall
Project Location:
Miami,
FL
33186
Date: 04/06/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Remodeling complete one bathroom with a shower and bah tub, change a toilet, need small cabinet of 36" and put a new tiles. The second one need to change a tiles but we can keep a toilet and cabinet is necessary for both a new tiles in a wall too.
Project Location:
Miami,
FL
33138
Date: 04/06/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Currently my 2 bedroom apartment has 1 large bathroom but separated into 2 areas (sinks, and toilet / shower area) divided by wall and door. All internal walls are dry wall only. I am interested in remodelling to create 2 small shower rooms coming off each bedroom. Potentially some additional space could be taken from walk-in closet.
Project Location:
Miami,
FL
33168
Date: 04/05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Replace bathroom wall, floor and front of tub tile. If you replace tub I need that as well.
Project Location:
Miami,
FL
33156
Date: 04/05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Remove bathtub replace fixtures,toilet and floor.
Project Location:
Miami,
FL
33183
Date: 04/05/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I would like an estimate for bathroom remodel. Also need tile repair in home.
Project Location:
Miami,
FL
33172
Date: 04/04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Project Location:
Miami,
FL
33130
Date: 04/04/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: bathroom renovation and changing of interior doors throughout
Project Location:
Miami,
FL
33130
Date: 04/04/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: i need to get a quote to remodel my bathroom
Project Location:
Miami,
FL
33186
Date: 04/04/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Looking to gut and redo a small 2nd floor master bathroom. I currently have a tub/shower and want to have it replaced with a shower.
Project Location:
Miami,
FL
33196
Date: 04/04/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: Bathroom remodel of the master bathroom. We want to move the toilet to add some space to the area
Project Location:
Miami,
FL
33161
Date: 04/03/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Replacement of Toilet has made me consider renovating the whole bathroom structure.
Project Location:
Miami,
FL
33186
Date: 04/03/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: all I need is someone to retile a bathroom floor (maybe 7ft X 9 ft) and help replace the vanity and put the existing top back on the vanity